| Availability: | |
|---|---|
| Quantity: | |
First, check whether the appearance is intact.
Before the product is put into operation, measure the DC reference voltage U1mA, which shall not be less than the value specified in GB11032 - 2000. Measure the leakage current at 0.75 U1mA, and its value shall not be greater than 50μA. Measure it once every four years after commissioning to see if it meets the requirements. Gapless arresters are not allowed to undergo power - frequency discharge voltage tests.
First, check whether the appearance is intact.
Before the product is put into operation, measure the DC reference voltage U1mA, which shall not be less than the value specified in GB11032 - 2000. Measure the leakage current at 0.75 U1mA, and its value shall not be greater than 50μA. Measure it once every four years after commissioning to see if it meets the requirements. Gapless arresters are not allowed to undergo power - frequency discharge voltage tests.
(a.) Suitable for indoor or outdoor use;
(b.) Ambient temperature: -40°C ~ +55°C;
(c.) Altitude: not exceeding 3000m (porcelain-housed type: not exceeding 1000m);
(d.) Power frequency: not less than 48Hz and not more than 62Hz;
(e.) The long-term power frequency voltage applied between the arrester terminals shall not exceed the continuous operating voltage of the arrester;
(f.) Areas with seismic intensity of 8 degrees or below;
(g.) Wind speed: not exceeding 35m/s.
(a.) Suitable for indoor or outdoor use;
(b.) Ambient temperature: -40°C ~ +55°C;
(c.) Altitude: not exceeding 3000m (porcelain-housed type: not exceeding 1000m);
(d.) Power frequency: not less than 48Hz and not more than 62Hz;
(e.) The long-term power frequency voltage applied between the arrester terminals shall not exceed the continuous operating voltage of the arrester;
(f.) Areas with seismic intensity of 8 degrees or below;
(g.) Wind speed: not exceeding 35m/s.
1. switchgears, Substation ,transformers,cable distribution box and various electrical equipment, such as vacuum circuit breaker , load break switch etc.
Our factory is the excellent supplier of State Grid Corporation od China.
2. Do you accept customized serveice?
We offer OEM/ODM service, can print your logo on product. our professional technical and quotation team can provice a satisfied project according to your drawing and parameters .
3. What is your MOQ?
Our MOQ is 1 piece.
4. How long is your delivery lead time?
It depends on your product requirement and quantity. Generally , 5~10 working days is avaliable.
5. How do you solve quality problems?
Please porvide detailed photoes of quality problems. our technical and quality testing department will analyse. we will make a satisfied soluton within 2 days.
6. What is your payment terms?
30%T/T in adcance, 70% before shipment. West union, L/C are also acceptable.
1. switchgears, Substation ,transformers,cable distribution box and various electrical equipment, such as vacuum circuit breaker , load break switch etc.
Our factory is the excellent supplier of State Grid Corporation od China.
2. Do you accept customized serveice?
We offer OEM/ODM service, can print your logo on product. our professional technical and quotation team can provice a satisfied project according to your drawing and parameters .
3. What is your MOQ?
Our MOQ is 1 piece.
4. How long is your delivery lead time?
It depends on your product requirement and quantity. Generally , 5~10 working days is avaliable.
5. How do you solve quality problems?
Please porvide detailed photoes of quality problems. our technical and quality testing department will analyse. we will make a satisfied soluton within 2 days.
6. What is your payment terms?
30%T/T in adcance, 70% before shipment. West union, L/C are also acceptable.